Baton Rouge
6767 Perkins Road, Suite 200
Baton Rouge, Louisiana 70808
(225) 769-0546
New Orleans
909 Poydras, Suite 1240
New Orleans, Louisiana 70112
(504) 593-2615
Lake Charles
1811 Ryan Street
Lake Charles, Louisiana 70601
(337) 214-6072
Austin
11801 Domain Blvd., 3rd Floor
Austin, Texas 78758
(512) 387-5948
Dallas
7700 Windrose Ave.
Dallas, Texas 75024
(469) 209-1592

Sanitary Sewer Overflow (SSO) Program

Services Provided
Pipeline Maintenance and Rehabilitation Design, Engineering, Surveying and Real Estate Services

Schedule
2008 - Present

The Baton Rouge City-Parish Department of Public Works is implementing an on-going Sanitary Sewer Overflow (SSO) Control and Wastewater Facilities Program to address existing sewer overflow and wastewater treatment challenges in the parish. At the same time, the City-Parish is planning for anticipated future growth. Our role in the SSO Program included analysis and rehabilitation of approximately 1,250 miles of existing gravity sewer pipelines.

As part of the $1.3 billion Baton Rouge SSO Program, CSRS has provided pipeline rehabilitation design and survey services in the development of 30 area-wide sanitary sewer rehabilitation projects located throughout the Parish. Our goals were to identify and reduce storm water Inflow and Infiltration (I&I) by utilizing the “Find and Fix” method. Pipeline rehabilitation services included analyzing and reviewing a broad spectrum of collected data to make corrective repair recommendations using both current trenchless technologies and traditional excavated methods. The primary source of data applied in making repair recommendations by our design team was closed-circuit television inspections (CCTV) of multiple components of the public gravity system, which included sewer mainlines, manholes and service laterals. The CCTV data was used with a field survey and visual inspections to design constructible solutions while minimizing inconveniences to the public appropriately. CSRS’ deliverables included construction plans, probable construction costs, survey maps, and acquisition of all necessary permits from applicable regulatory agencies. Once the design was complete, CSRS assisted the program with bidding, contracting, and construction administration support.

In addition to the rehabilitation services, our firm provided right of way, land acquisition, and relocation assistance services for the entirety of the SSO Program.

Contact Us

Brandon Hebron, P.E.
Project Manager

Brandon Hebron is a licensed engineer with 15 years of experience in civil engineering. His expertise is providing technical support for preparing designs, using innovative solutions, and providing permit assistance to all lines of business for drainage, roadways, sewer, utilities, ground surveys, as well as traffic control and signage matters.

Contact

Contact Us


Related Work

View All Projects

Coastal Impact Assistance Program (CIAP)

Program Management and Federal Grants Management The Coastal Impact Assistance Program (CIAP) was established by Section 384 of the Energy […]

Read More

Sanitary Sewer Overflow (SSO) Program

The Baton Rouge City-Parish Department of Public Works is implementing an on-going Sanitary Sewer Overflow (SSO) Control and Wastewater Facilities […]

Read More